Our client is looking for an Electrical Project Engineer to work with them on a sugar plant in Bury St Edmunds. This will be an initial contract for 3 months but this will likely be extended to over 12 months as the project progresses.
The scope is to develop documentation required for the project program select phase, which is due for approval before end of March 2025. This project is designed to enable improvements in operational efficiency through the replacement of obsolete control systems and Motor Control Centres (MCCs), which are critical for the seamless operation of equipment.
An Electrical Project Engineer is required to develop high level design of the existing system and provide recommended design for the next 5 phases of the project. The Electrical Project Engineer will be required to provide estimate costing of the MCC upgrade for all 5 phases. The detailed engineering is not required at this stage of the project.
The purpose of the work done in this phase is to provide documentation required to provide information to the Project Steering Committee to be able to get decision/approval for the next 5 phases of the project. This includes selection of the MCC areas for each of the 5 phases of the project based on cost, benefit, and risk analysis. The documentation will provide a high-level capital required for the next 5 phases of the project. The major constraint for this project is limited plant shutdown period availability. The short outage could be limited to 1 week.
The ECD project will focus on upgrading of the obsolete MCCs across the entire factory. Safety Compliance Survey was conducted on all the MCCs and Control Systems. The project will address electrical safety gaps in the MCC highlighted by the functional safety compliance survey.
The Electrical document pack will be developed by using existing drawings and information available at the plant. The engineer will be required to spend the majority of the time on site to collect information as well as to complete the site survey.
A high-level information pack for the existing electrical system must be developed. The information pack must include the following:
A functional safety survey was conducted by Siemens on all the electrical MCCs and distribution panels. The survey report was submitted, and recommendations were provided. These recommendations must be applied to the existing panels and the following documentation must be provided to plan risk mitigation:
A high-level information pack for the electrical system upgrade plan must be developed. The information pack must include the following. The short shutdown period of 1 week should be the core of the proposed upgrade plan:
A 5-year phasing of the proposed electrical upgrade plan must be developed. The phasing approach must be discussed with the factory operations team to agree on the final phasing of the upgrade plan. The following documents must be provided to the project team to allow for decision making on the project phasing:
The following list should be used as a guide to the Out-of-Scope items/areas for this phase of the project:
Limited factory shutdown time available. Between 1-2 weeks. Interdependencies of the project phases with the other ongoing and planned projects.
Following are the skills and attributes essential for the Electrical Project Engineering role:
The NRL Group connects global companies with the right people to bring engineering projects to life. Supporting contracting companies with energy transition plans and working with our clients to create a cleaner, greener future.
We welcome applications from every walk of life and are committed to diversity within the industries we support, as a certified Inclusive Recruiter and Armed Forces friendly employer.
You can ensure you stay safe when job searching online by visiting the JobsAware website.