Education Required: Master of science or above in a relevant field of engineering (Mechanical Engineering, Naval Engineering etc...).
Position start: ASAP
About Principle Power
Principle Power is a leading global technology and services provider for the floating offshore wind energy market. The WindFloat, the company’s globally and proven floating platform technology, enables offshore wind turbines to be sited in any water depth or seabed condition, unlocking offshore wind potential worldwide and allowing projects to harvest the best wind resources. Principle Power acts as a trusted partner to developers, independent power producers, utilities, and EPCs, supporting its customers throughout the entire lifecycle of their projects. With 105 MW of cumulative capacity in operation or under advanced development and a multi-GW commercial pipeline globally, Principle Power is the market leader in floating offshore wind technology.
General Description
The Installation Engineering Group splits its focus between the execution of engineering activities in support of current commercial projects and the execution of R&D studies to optimize the performance and ultimately reduce the cost of the WindFloat technology for future projects, while maintaining reliability of the overall technology.
The Mission of the Installation Engineering Group is to assess methodologies and concepts to be considered in the design for safe and efficient installation (and decommissioning) of WindFloat platforms and systems, matching client needs and project specific constraints.
Within this group, the Senior Installation Engineer is capable of carrying out the engineering work with minimum guidance. This position reports to the Installations Engineering Discipline Manager.
Main Accountabilities
Skills & Competencies
Other requirements