MIA Water and Sewer Connection Project: Contractor

The Manitoba Islamic Association
Manitoba
CAD 60,000 - 100,000
Job description

MIA Water and Sewer Connection Project: Contractor

Currently, the Waverley complex has sewer and water tanks and they are filled/emptied 2-4 times a week depending on the activities. MIA is working towards city water and sewer connection. A preliminary design was completed by Sandbox Consulting who will also serve as the contract administrator. The Project is being managed by the Capital Project Committee.

If you are a contractor and interested to bid, please contact Br. Abdul Aziz, P.Eng. @ azizmian9000@gmail.com or (204) 390-0686.

Qualifications for Contractor: Commercial Water and Sewer Connection

1. Scope:

  • Supply and install water and sewer main at Waverley Street as outlined in the drawings.
  • Connect existing water service near cistern as per drawings.
  • Connect sewer services as per the drawings.
  • Supply and install manhole.
  • Supply and install water meter.
  • Remove existing sewer tank.
  • Decommission existing high-level alarms and the old system.
  • Landscape restoration with the topsoil and seed.
  • Decommission old expansion tank and pump control panel within the mechanical room.
  • Cistern pumps to be returned to the client.
  • Provide total price excluding applicable taxes.
  • MIA will propose to keep the excavated fill on site at a designated location within the 12 acres parcel. Provide an optional cost separately if MIA needs to get the excavated material hauled away.
  • Outline any exclusions not part of the price. If any work is not clearly outlined in the exclusions, it is deemed to be included in the scope.
  • The contractor will apply for the permit. Permit cost can be considered cash allowance.
  • For Water Service: Pressure and Bacteriological to CoW Standards. For Sanitary Sewer: CCTV of completed installation and of the main connection to CoW Standards.
  • The contractor will work through MIA contract administrator Sandbox Consulting.
  • The contractor will provide work schedule with minimum disruption and coordinate the work to avoid traffic problems on Friday Jummahs.
  • New water main to be tested and passed before connection to/and decommissioning of the existing service. The existing water shutdown time must be minimized and approved by MIA liaison 5 working days prior to commencing the work.
  • Contractor must be listed as an approved contractor by the City of Winnipeg.
  • Ensure the work complies with municipal, provincial and all other applicable regulations and codes.
  • Mark utility lines and boundaries.
  • Safely excavate to the required depth, following environmental guidelines.
  • Implement safety barriers and signage around the work zone.
  • Install backflow prevention devices as required by local codes.
  • Conduct pressure tests on water/sewer lines to check for leaks and integrity.
  • Perform smoke tests on sewer lines to identify leaks or obstructions.
  • Schedule inspections with local authorities to verify compliance with all regulations.
  • Properly backfill trenches with appropriate materials to avoid future settlement.
  • Restore the site to its original condition, including landscaping and pavement repairs.
  • Provide as-built drawings detailing the completed installation.
  • Supply manuals for any installed equipment (e.g., pumps, backflow preventers).
  • Submit a final project report summarizing the work completed, tests conducted, and any issues encountered.
  • Minimum 1 year warranty for underground service installations against all defects related to construction and materials.
  • Provide documentation outlining maintenance plan.
  • Follow environmental regulations to minimize impact during construction, including erosion control measures.

2. Licensing and Certifications:

  • Must be registered as an approved Contractor with City of Winnipeg Water and Waste Department.
  • Certification in backflow prevention and testing.
  • Compliance with local, state, and federal regulations regarding water and sewer connections.
  • COR certified.
  • The contractor must be in good standing with BBB and companies’ office.
  • The contractor must be free from default and criminal activities.

3. Experience:

  • Minimum of 5 years of experience in commercial water and sewer installations.
  • Demonstrate a proven track record of successful projects similar in scope and complexity.
  • Demonstrated experience working with municipal water and sewer authorities.

4. Technical Expertise:

  • In-depth knowledge of plumbing codes, regulations, and industry best practices.
  • Proficiency in using tools and equipment required for water and sewer installation.
  • Familiarity with various piping materials (PVC, HDPE, ductile iron, etc.) and installation techniques.

5. Project Management Skills:

  • Ability to manage multiple projects simultaneously while adhering to timelines and budgets.
  • Strong organizational skills to oversee project logistics, including scheduling and subcontractor management.
  • Effective communication with clients, regulatory agencies, and project stakeholders.

6. Safety Record:

  • Demonstrated commitment to safety protocols and practices on job sites.
  • WCB registration and record required for submission.
  • Current safety training certifications (e.g., OSHA, CPR).

7. Insurance and Bonding:

  • Proof of 1M liability insurance and workers’ compensation coverage.
  • Ability to provide performance and payment bonds as required.

8. References:

  • Submission of at least 2 client references from previous commercial projects.
  • Contact information for at least two municipal or regulatory contacts for past projects.
  • Evidence of financial stability and capacity to handle project costs, including bonding capacity.
Get a free, confidential resume review.
Select file or drag and drop it
Avatar
Free online coaching
Improve your chances of getting that interview invitation!
Be the first to explore new MIA Water and Sewer Connection Project: Contractor jobs in Manitoba