Responsible for the planning function of all approved static equipment jobs included in the turnaround scope.
Make a site visit to verify the scope of work and location of the work, access needed, lifting requirements, and insulation removal.
Identify turnaround activities, estimate resources, durations, and establish precedences as the main input for the scheduling.
Identify needs for assisted access (scaffolding, man-lifter) and insulation removal as preparative activities for the static equipment-related works. Notify the Scaffolding Planner.
Identify flanged joints to be hot-bolted during the pre-turnaround phase and prepare a hot-bolting plan.
Prepare and identify the BOM.
Can read the equipment drawings.
Work closely with the execution contractor to ensure his complete familiarization and commitment to the turnaround plan, which will be a key factor for the success of the turnaround.
Prepare Work Instructions and Lifting Plans for the static equipment works under the turnaround scope.
Identify critical lifting operations that require a comprehensive rigging study.
Assemble the Work Packages.
B.Sc. or Diploma in Mechanical Engineering.