Experience in Senior Level Pipeline QS (proficient in the piping and pipeline activities) working experience to enable the work closely with Field Engineering, Procurement, Cost Control, Construction, and Contracts department to ensure Quantity and Cost control work flow established for the Project on all levels to ensure the risk identified during Project period based on the Project Contract document, Project schedule, Project quantity, and Project deliverables to avoid schedule and cost impact.
Experience in submitting the Fortnight report on the identification of all Risks envisaged related to the Scope Specification. Documents related to the Project and also to submit periodically the Risk Mitigation plan based on the EPC/ Contractor performance.
Should be capable to develop a strategic plan and provide a fortnight report to management on Risks identified against the Quantum of the work and to submit comprehensive plans to mitigate the Risks to execute the projects within time and budgeted parameters.
Able to work independently to review and provide reports against Claims raised by EPC/ Implementation Contractor/Subcontractor and advise Cost Controlled Solutions to Management. Timely crosschecking the MTO with AFC drawings and updating the procurement team on any additional requirements to complete the project.
Should understand the Project Design methods & proven abilities for anchoring best construction methods to ensure project completion within the schedule & cost based on continuous monitoring of the Site activities.
Practical experience in handling the entire project strategic life cycle with competency on devising Quantity and material schedules to implement with Site management based on the Material delivery schedule and Construction schedule in line with Field progress for pipeline Offplot OnPlot on interacting with other disciplines of Piping, Mechanical, Civil, E&I, Hook up, Manifold flow line, 3rd party Tie-in and 3rd party interfaces for Schedule and Cost Control.
Should be able to work closely with Field Engineering and interact with other discipline QS to enable the construction methodologies executed as per project requirement with concerned authorities and to control the vendor supplied material and 3rd Party Material, prepared and finalized the Material Requisition packages for Tie-in during Construction stage for pre-shutdown & shutdown activities (Pipeline, Piping E & I Tie-ins).
Practical experience to work on Field changes for respective FCN DCN approval with Company against design Engineering Contractor site reports interpretation for the material Control which includes the Red Line Field Change & Design Change based on the Site variation and also for the Test pack approval & As Built requirement. Field verification of Tie-in prior to demolition/construction for the Construction package endorsement before Execution.
Should have extensive work experience in Installation Work package (IWP) and the Workface planning (WFP) for organizing and delivering (AWP) advanced work package methodology by implementing the IWP Work package with System/Sub Systems during the construction phase by Disciplines Areas/System/Sub system with Milestones as per Approved Construction schedule.
Expert in the Quantification of Pipelines, Flowlines, and Hook up including interacting and coordination with other disciplines of Civil, Electrical & Instrumentation works.