Job Description
a. Operator Line-up Station and align the pipe joints in the bead stall.
b. Check the field joints number and length physically and confirm with the load out sheet to prepare pipe tally record.
c. Prepare and arrange the Anode Joints in the pipe ready rack.
d. At the end of shift hand over the pipe tally records to Barge Office to prepare Pipe and Weld Record.
Skills Required