Prepare and execute the following outage activities in accordance to Nawah standards and procedures:
Fuel Receipt including the unloading and storage of the fuel shipping cask as well as the fuel handling, inspection and storage of the fuel assemblies.
Initial Fuel Loading including the handling of the neutron source, the calibration of the neutron flux monitoring, inspection and interlock tests of the fuel handling equipment, FME, installation of underwater lightings into the reactor core, transfer of the dummy fuel assembly to the RCB and repositioning of the temporary fuel load channel.
Reactor Pressure Vessel (IHA) Integrated Head Assembly Disassembly & Re-assembly including vessel internals such as Upper Guide Structure (UGS) & Core Support Barrel (CSB).
Removal and re-Installation of components such as but not limited to pressure boundary, push and pull cables, 54 Reactor Vessel-